Search
Picture for category Auxiliary Boiler Equipment

Auxiliary Boiler Equipment

6745 kw Siemens SST-110 Steam Turbine Generator, Year 2018

467235
6745 kw Siemens SST-110 Steam Turbine Generator, Year 2018. Single Stage Back Pressure Turbine Design. Inlet Steam: 90,000 #/hr Steam at 850 PSI and 650 F. Exhaust Steam: 90,000 #/hr at 46 PSI and 375 F. Exhaust Steam Pressure is variable depending on process conditions. Includes: 8750 KVA AC Synchronous Generator Manufactured by TD Power Systems, Type TC150. Capacity: 7.0 MW / 13.8kV / 60 Hertz. Year 2018. System used less than one year due to complete plant closure. All controls and MCC panels are available. Desuperheater is available to control exhaust steam temperature. SPARE TURBINE ROTOR ASSEMBLY INCLUDED.

30000 Lbs/Hr. Super Heater Model SH6G by FSE Energy. Year 2012

126769
30000 Lbs/Hr. Super Heater Model SH6G by FSE Energy. Year 2015; Unused/New Surplus. Natural Gas Fuel. Max Operating Pressure: 425 PSI; Max Operating Temperature: 750 F; Heat Capacity: 6000000 BTU. Input of 30k PPH 425 PSI Steam @ 437 F; Output of 30k PPH 410 PSI 750 F Superheated Steam. Never installed Power Distribution and Heater Management for Super Heater System used to convert saturated steam or wet steam into superheated steam or dry steam. Designed for use with Flu Gas Return. Power Flame Burner Model C8-G-30 Natural Gas.

655 kW (878 HP) Turbosteam Steam Turbine

467050
655 kW Steam Turbine with Generator. System includes, Dresser-Rand Coppus RLHA 24 Turbine, Marathon Synchronous Generator, and Lufkin Speed Reducing Gearbox. Year 2013. Turbine Generator Skid: A common steel base is provided for the turbine, speed reducing gear and generator. The turbine and gear are coupled with a Lovejoy flexible stainless steel disc spacer type coupling, dynamically balanced to a maximum 2.5 mm/sec of vibration and meeting ISO G2.5. The generator and gear are coupled with a Lovejoy gear-type coupling with a 1.5 service factor. Coupling guards are installed over both couplings. Skid piping includes all piping necessary to collect condensate drains, steam leak offs and instrument air to single field connection point. Manual globe valves are installed in condensate drain lines for startup condensate removal. Skid wiring includes all conductors and conduit necessary to consolidate terminations for all skid instrumentation and control devices in a common terminal box.